Figured I'd start a build thread. New cabin to play in during the winter months down here on the KP...
Had a guy out of Homer come set/drill some pilings (techno metal post alaska)....good dude and cost effective way to go.
Took a few days to get us to this point...
Wanted to start the build around 8', to get a better view...
Hoping to start framing around the 14th of the month.
Had a guy out of Homer come set/drill some pilings (techno metal post alaska)....good dude and cost effective way to go.
Took a few days to get us to this point...
Wanted to start the build around 8', to get a better view...
Hoping to start framing around the 14th of the month.